Tender Watch
Search Title: Advanced Search
Document required for Electical Tenders   Download BSNL EW-8 for Electrical Tender
List of Latest Tenders
Tender No. Date of Issue Department Category Opening Date Closing Date Title
33/WB/CD-KOL/BSNL/NIT/2024-25 07/09/2024 Circle Office Civil Repairing works 21/09/2024 18/09/2024 Construction of toilet and repairing of Store building at Baranagore WL Station.
27/TCD-SLG/2024-25 05/09/2024 Siliguri Civil Repairing works 25/09/2024 25/09/2024 Renovation of ladies rest room including replacing tiles in toilet at 2nd floor of main T.E. building (Admin Portion), Siliguri.
26/TCD-SLG/2024-25 05/09/2024 Siliguri Civil Repairing works 25/09/2024 25/09/2024 Repairing including floor raising/roof treatment at BTS room, Deviganj & roof treatment at BTS room, Chikonmati
25/TCD-SLG/2024-25 05/09/2024 Siliguri Civil Repairing works 25/09/2024 25/09/2024 Repair of BTS Shelters bases at Air View More & S.F. road, door repairing at North Bharatnagar & Sevoke More,Siliguri.
24/TCD-SLG/2024-25 05/09/2024 Siliguri Civil Repairing works 25/09/2024 25/09/2024 Repair & maintenance of newly allotted Civil offices in main TE compund, Siliguri
18/TCD-SLG/2024-25(3rd Call) 04/09/2024 Siliguri Civil Repairing works 19/09/2024 19/09/2024 Arresting roof leakage & replacement of damaged floor of BTS Shelter at DEBI NAGAR, District -Jalpaiguri
14/TCD-SLG/2024-25(3rd Call) 04/09/2024 Siliguri Civil Repairing works 19/09/2024 19/09/2024 Arresting roof leakage of BTS Shelter at HUSLUDANGA, District - Jalpaiguri
15/TCD-SLG/2024-25(3rd call) 04/09/2024 Siliguri Civil work 19/09/2024 19/09/2024 Arresting roof leakage & replacement of damaged floor of BTS Shelter at MANIARPUL(PAKURITALA), District -Jalpaiguri
17/TCD-SLG/2024-25(3rd Call) 04/09/2024 Siliguri Civil Repairing works 19/09/2024 19/09/2024 Arresting roof leakage & replacement of damaged floor of BTS Shelter at DALDALIA, District -Jalpaiguri
16/TCD-SLG/2024-25(3rd call) 04/09/2024 Siliguri Civil Repairing works 19/09/2024 19/09/2024 Arresting roof leakage & replacement of damaged floor of BTS Shelter at CHAPARERPAR, District -Jalpaiguri
22/BSNL/ED-KGP/2024-25, Date: 30.08.2024 30/08/2024 Electrical metering kiosk 09/09/2024 07/09/2024 "Replacement of Out Door type Metering Kiosk with allied works at different BTS Sites under OA Kharagpur, BA-Kharagpur
23/BSNL/ED-KGP/2024-25, Date: 30.08.2024 30/08/2024 Electrical E/I works 10/09/2024 07/09/2024 Replacement of Main switch, ACDB, Isolator , MCB's with re-arrangement of power cable connections at different BTS sites under OA Kharagpur, BA-Kharagpur
24/BSNL/ED-KGP/2024-25, Date: 30.08.2024 30/08/2024 Electrical E/I works 10/09/2024 07/09/2024 Repairing of electrical installation & compound light at Chiranjibpur TE, Haldia TE & Halida Town Ship Staff Qtrs. Complex under OA Kharagpur, BA - Kharagpur
25/BSNL/ED-KGP/2024-25, Date: 30.08.2024 30/08/2024 Electrical Free Cooling system 11/09/2024 09/09/2024 SITC of 05 Nos. Free Cooling system at different TE/BTS sites under OA Bankura, BA - Kharagpur
26/BSNL/ED-KGP/2024-25, Date: 30.08.2024 30/08/2024 Electrical Free Cooling system 11/09/2024 09/09/2024 SITC of 09Nos. Free Cooling systems at different TE/BTS sites under OA Purulia, B.A Kharagpur
21/BSNL/ED-KGP/2024-25, Date: 30.08.2024 30/08/2024 Kharagpur Surveillance System 09/09/2024 07/09/2024 “SITC of CCTV Surveillance system at D-TAX Bldg. Campus, Inda, Kharagpur under BA Kharagpur
20/BSNL/ED-KGP/2024-25, Date: 29.08.2024 29/08/2024 Kharagpur Cable 09/09/2024 09/09/2024 Supplying of 3 & 1/2 Core x 240 Sq. mm. Size PVC Sheathed, LT XLPE Armoured Stranded Aluminium Conductor of 1.1KV grade Power Cable at Telecom Factory- Nimpura, Kharagpur
24/TED-II/KOL/2024-25 28/08/2024 Electrical AC Window / Split Units 09/09/2024 09/09/2024 SITC of 4x 1.5 TR 3-Star Non-Inverter Split AC units i/c allied works at Kulpi Earth Sat Station (old bldg.), 24pgs(S) under CNTX-East. (SH: Shifted to New location at ETR OFC Berhampore)
1)14 & 15/BSNL ED-ASL/24-25 Dated 17.08.2024 2)NIT/Corr/TED-ASL/2024-25/88 Dated 28.08.2024 28/08/2024 Electrical CORRIGENDUM 29/08/2024 29/08/2024 1)Thorough Servicing of 1X 63 KVA DEA Set (Model HA694) Make Kirloskar at T.E Bldg. City Centre Durgapur,2)Emergency basis fault attending, supplying and laying cable i/c metering connection arrang
16/BSNL ED-ASL/24-25 Date: 27.08.2024 27/08/2024 Electrical Dismantling & shifting 09/09/2024 07/09/2024 Dismantling of all EI & fans, SAC units, AFD system, and shifting AC machine at CSC i/c other allied electrical works at DTO Bldg Asansol under BA Asansol.
20 latest documents have been displayed here.
To see more, go to the Home page
Conceived and Implemented by IT Cell, West Bengal Telecom Circle.